衡水浩威新材料有限公司主营产品:钢波纹管、钢波纹涵管

钢波纹管的工艺流程图闪现

浏览:10362 发布日期:2021-07-07

钢波纹管和高强度螺栓、螺母,出厂前有必要进行热镀锌防腐处理。每走一批货都查验并附产品合格证。施工准备施工所需钢波纹管由工厂规范化消费后运送施工现场,间断现场拼装,管节设备位终了后回填。整个流程包含:根底的开挖、现场的拼装、回填三个阶段。

Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.

钢波纹管

钢波纹管

因为卷好的金属波纹涵管长度较长,体积较大,一般是工程单位向厂方提规格、数量,由厂方带设备及材料到施工现场加工。这样既可大大减少波纹管的损耗(短头、碰伤、锈蚀等),又能满足需方的各项要求,并节约经费。金属波纹管现场卷制好后。

应存放在千燥场所,下面用档距为1.6m的木板多档架空,上面掩盖防雨油布等隐瞒物,堆积高度不宜超越7m。与圆管涵比较,波纹管涵的管侧水平位移、挠度和对路途的扰动小,有利于维护路面。管内切向与轴向应力应变以及挠度和大等效应力在恒载作用时随填土高度的增加有呈线性增加的规则。

钢波纹管

钢波纹管

活载作用时随填土的高度增加逐渐减小;总体上切向应变力应变大值大于轴向大值;管顶以切向应变为主。金属波纹管在运送、装卸过程中,都要分外留神。不能翻滚或磕碰硬物,防止波纹管壁变形或损伤镀锌层。

钢波纹管的运送与设备钢波纹管通常选用工厂规范化消费,出厂时已间断镀锌处置。用汽车运送工地后,卸货时不可直接翻拉,使用吊车合作人工间断装卸,防止损坏镀锌层。操作关键运到工地后,有必要每块查看尺度,并从金属波纹管中随机抽取一片板件、高强螺栓。

然后进行尺度、防腐、强度等项目的查验。查验数据应满足相关要求。施工放样涵洞施工前要片面熟谙规划文件和规划技术交底,现场核对涵洞的立体位置和角度,如有成绩及时提出,施工便道建筑结束并能满足施工需求。http://www.hshaowei.com/

[返回]   
分享此文章:
在线咨询
全国统一服务咨询热线
13803180223
业务联系人:王华
电话:0318-7093363
传真:0318-7093373
地址:衡水经济开发区
  • 扫一扫获取
    钢波纹管产品报价

版权所有:衡水浩威新材料有限公司   ICP备案/许可证号:冀ICP备2024050732号-1   技术支持:衡水龙腾网络公司